|
An on-site method that retards reflection
cracking and considerably extends pavement life. Rehabilitates
deteriorated bituminous pavements with minimal use of new
materials and with minimal change in grade.
|
|
Each $1.00
not spent during the first 40% drop in quality
will cost $4.00 to $5.00 if delayed until the
pavement has lost 80% of its original quality.
|
|